<img height="1" width="1" style="display:none" src="https://www.facebook.com/tr?id=1073028186981917&amp;ev=PageView&amp;noscript=1">

Sweeper: System Check

Site Ops Clear It / Clean Up
Proper methods for confirming broom attachment is connected and functioning properly; basic maneuvers for efficiently sweeping material.
2m 10s 4m

Silt Fence It!

Site Ops Clear It / Earthworks
Proper installation of silt fence, focusing on site terrain and slope, water flow and projected soil disturbance during construction.
4m 44s 4m

Bulldozer: Rough Time

Site Ops Clear It / Earthworks
Using a bulldozer to perform basic rough grading work, preparing a site for fine grading and restoration.
6m 14s 4m

Excavator: Can You Dig it?

Site Ops Clear It / Earthworks
Basic operation for digging round and flat bottom trenches. Covers establishing proper pitch and grade, as well as safety fundamentals.
3m 51s 4m

Trench It

Site Ops Clear It / Earthworks
Best-Practices when digging a trench, requirements for installing trench shields, understanding the importance of soil conditions.
2m 28s 4m

Tamp That: System Check

Site Ops Clear It / Earthworks
This module discusses the proper system check that a mechanic must perform to ensure that the attachment is functioning properly before sending it out for use in the field.bu
4m 22s 4m

Culvert: Excavate

Site Ops Clear It / Waterworks
Expert approach for replacing a partially collapsed culvert. Outlines benching requirements, dewatering and basic methods to address scour.
4m 37s 4m

Water is Solid: Hydro-Demolition

Site Ops Clear It / Demolition
Demonstration on demolition using high pressure water, identification of key operating elements of the mechanical set up.
3m 57s 4m

Crush It!

Site Ops Clear It / Demolition
This module covers the best practices for crusher maintenance, safety protocols, LOTO and basic operations.
4m 28s 4m

Hammer Time: System Check

Site Ops Clear It / Demolition
This module details the correct method for performing a system check of a hammer attachment prior to field use.r
2m 10s 4m

ChainSaw It!

Site Ops Clear It / Clean Up
Overview on proper and safe techniques for using a chainsaw. This modules covers various cutting techniques such as limbing and bucking, as well as various tools and accessories.
7m 30s 4m

Snowblow It: Operate

Site Ops Clear It / Clean Up
Covers the basic operations and efficient control of the snowblower attachment.
4m 22s 4m

Motor Grade It: Pitch Perfect

Site Ops Clear It / Earthworks
Covering the basics on setting pitch and grade when operating a motor grader.
1m 50s 4m

The Slope: Squeeze It

Site Ops Clear It / Earthworks
This earthworks module covers basic berm construction, working with highly saturated materials and stabilizing a slope.
5m 15s 4m

The Slope: Aerate It

Site Ops Clear It / Earthworks
Techniques for safely and efficiently managing moisture rich material from dredging activities.
4m 12s 4m

The Slope: Lay It Out

Site Ops Clear It / Earthworks
Covers safe dozer operations on a slope and tactics when working with wet material.
6m 35s 4m

Culvert: Place and Cover

Site Ops Clear It / Waterworks
Expert approach for replacing a partially collapsed culvert. Outlines how to properly backfill and compact the ground to prevent settling problems with the road.
1m 33s 4m

Detention

Site Ops Clear It / Waterworks
Practical application of placing an underground detention system for drainage control. Covers basic surveying, installation approach and backfilling.
4m 5s 4m

Lay It Under

Site Ops Clear It / Waterworks
This module covers trenching practices and placing underground drainage. Demonstration of the proper use of filter fabric, installing connectors and backfilling.
4m 8s 4m

Get Over It! Stream Crossing

Site Ops Clear It / Waterworks
This dynamic module covers the foundational design for a temporary stream crossing, various uses of material and proper maintenance of the crossing.
3m 54s 4m

Just Dredge It!

Site Ops Clear It / Waterworks
Dredging is the process of excavating and removing moisture-rich material from an environment. This module covers key methods for actively managing materials.
4m 54s 4m

Just Dredge It: The Bank

Site Ops Clear It / Waterworks
This module will show you how to successfully grade the slope to reduce erosion and keep material from filling the channel.
5m 10s 4m

Vac Truck: Operations

Site Ops Clear It / Clean Up
This module explains the proper operation of the VACUUM function for the truck.
2m 35s 4m

Vac Truck: Wash It

Site Ops Clear It / Waterworks
This equipment module covers the basic operation of the high pressure washing function of the Vac Truck
2m 35s 4m